A black monolith data centre standing on a grassy hill between two transmission towers
Data centre advisory from land to launch

Every gigawatt starts with 1Watt.

The most expensive decisions in a data centre are made when it still looks cheap: a plot of land, a power letter, a sketch on a whiteboard. By the time the concrete arrives, the outcome is mostly decided. 1Watt works at those early, unglamorous moments and stays through design, delivery and launch, in India and across the Middle East, because every megawatt costs the same to build. The good ones are simply decided earlier.

Every watt of our experience comes from
Who we work with

Everyone at the table.

We've sat in most of the seats, so we know what the person across from you needs to hear.

A white scale model of a data hall under construction with a crane01

Developers & Operators

Where they are
Land or power in hand, capacity to build and fill.
Call when
Power sanctioned, design about to lock, go-live 12–18 months out.
A white model city block with glowing roads converging on one tower02

Investors

Where they are
Funds and family offices backing platforms and assets.
Call when
An acquisition, a joint venture, a growth story to test.
A white model plot of land with a small substation at its corner03

Asset & Landowners

Where they are
Powered land or buildings that may be worth more as a data centre.
Call when
An offer arrives, grid capacity opens up.
A white model headquarters tower beside a low glowing building04

Enterprises

Where they are
BFSI, global capability centres, manufacturers.
Call when
A lease expires, an audit lands, the board asks for AI.
A white model data hall with rows of glowing racks05

Neoclouds & AI labs

Where they are
GPUs on order, nowhere dense enough to land them.
Call when
Allocation confirmed, funding closed.
Your buyers

Three buyers. Three very different deals.

5–20 MW blocksPowered shell
A white server rack with its door ajar and a blue status strip

Hyperscale

→
What they need
5–20 MW blocks, sanctioned power, a believable go-live date.
What stalls the deal
Unproven delivery, approval risk, a thin renewables story.
40–130 kW / rackLiquid cooled
A white data-centre GPU accelerator card with a blue light line

Neocloud

→
What they need
40–130 kW per rack, liquid cooling, fast ramp.
What stalls the deal
Retrofit-only density, a slow go-live, power cost.
250 kW–2 MWCompliance-led
A white colocation cage with a locked mesh door

Enterprise

→
What they need
250 kW–2 MW, compliance proof, managed services and DR.
What stalls the deal
Migration risk, missing certifications.
India, 2026

The numbers that get decided early.

₹50–75 Crper MW to build

Tier III air-cooled near ₹50 Cr; AI-ready with liquid cooling up to ₹75 Cr.

₹8.9–9.2Kper kW per month

About ₹7,100 for large wholesale up to ₹11,700 for small Mumbai deals.

~50%of capacity in Mumbai

National vacancy close to 15%; Hyderabad, NCR and Chennai lead the pipeline.

3–4 yrsfrom site to live

Approvals, build and commissioning take 27–42 months.

Indicative figures from published industry data, adjusted to 2026 where needed. Ask us for yours.

Why 1Watt
Every data centre began as a decision someone got right early. We're in the room for those decisions.
How we work

Five moves. No theatre.

  1. 01

    The question

    Bring us the decision keeping you up at night. We'll tell you fast whether we're the right people for it.

  2. 02

    The scope

    One page: what we'll answer, what you'll get, by when and on what terms. Signed before anyone opens a spreadsheet.

  3. 03

    The work

    We go to the site, the substation, the market and the buyers. You hear what we're finding while it still matters.

  4. 04

    The answer

    Not a deck of opinions. A clear call, with every finding showing what it stands on.

  5. 05

    The long haul

    We don't vanish after the readout. Oversight, GTM Studio or managed operations takes it to first load and beyond.

Got a decision on the table?

Tell us the site, the stage and the question. We'll tell you where we'd start.

Talk to 1Watt →
How to engage

One line, or the whole lifecycle.

Buy a single service, or hand us the project from land to a leased, running facility.

01

Advisory

Fixed-scope studies and reports: market, site, feasibility and business case.

Best for
Investors testing the idea
02

Development manager

1Watt leads land, approvals, capital, design and build as your representative.

Best for
First-time data centre investors
03

Build-operate-transfer

We take the project from land to live, run it, then transfer the team and operations to you.

Best for
Investors who want to own the platform long term
04

Managed operations

DCOps, NOC, SOC and RevOps, run by us under SLAs.

Best for
Owners of completed facilities
05

Fractional leadership

An interim CEO, COO, CTO or head of sales while you build your own team.

Best for
Platforms building their own team
06

Success-linked mandates

Debt raising, incentives and anchor leasing, rewarded on results.

Best for
Investors who want pay-for-results
Talk to us

We know what buyers ask because we've been the buyer.

Developers, investors, operators and enterprises all get the same thing from us: the answer.

Talk to 1Watt →